4. Data model

4.1. Basic

River networks are represented using three basic elements: vertex, edge, and flowline.

Basic elements

Within PyFlowline, these three elements are combined with several other data structures.

PyFlowline structure.

This figure illustrates a domain containing two watersheds/basins. Each basin has an outlet. Within each basin, there are several subbasins and confluences. The lower right is a zoom-in view of a flowline.

4.2. Spatial references and computational geometry

All the internal data elements use the geographic coordinate system (GCS).

All the computational geometry algorithms are based on GCS:

Input

Output

Algorithm

Location

vertex(lon, lat)

vertex(lon, lat)

Distance

vertex A, B

Distance (m)

Great circle

Area

vertex A, B, C, … D

Distance (m2)

Spheric area

4.3. File I/O

4.3.1. Configuration files

PyFlowline uses two JSON-format configuration files to manage all input information, where major model input parameters and paths are specified. These configuration files have a parent-child relationship:

  1. The parent configuration file stores parameters for the entire domain.

  2. The child configuration file stores parameters for each individual watershed.

These files serve as the entry point for setting up and running a PyFlowline case. They can exist wherever the user prefers, but PyFlowline uses the paths specified in these files to locate model inputs and write outputs. Model inputs, outputs, and a recommended directory structure are described in the following two sections.

To create a new PyFlowline case, pass the full path to the parent configuration file to the pyflowline_read_configuration_file function. This will return a PyFlowline object configured with the values from the file, and it can be used to run the model. See the example notebooks for a demonstration.

Note that the “parent” configuration file contains one block of parameter-value pairs that apply to the entire domain. In contrast, the “child” configuration file contains one block of parameter-value pairs for each watershed. A domain with a single watershed will have a single block in the “child” configuration file, while a domain with multiple watersheds will have multiple blocks.

An example parent JSON file for the Susquehanna River Basin domain (with <domain_name> as “susquehanna”) is provided below:

{
    "sFilename_model_configuration": "/full/path/to/pyflowline/pyflowline/config/hexwatershed_susquehanna_mpas.json",
    "sWorkspace_data": "/full/path/to/input/data",
    "sWorkspace_output": "/full/path/to/output",
    "sWorkspace_project": "/hexwatershed/susquehanna",
    "sWorkspace_bin": "/full/path/to/bin",
    "sRegion": "susquehanna",
    "sModel": "pyflowline",
    "sJob": "hex",
    "iFlag_standalone": 1,
    "iFlag_create_mesh": 1,
    "iFlag_mesh_boundary": 1,
    "iFlag_save_mesh" :1 ,
    "iFlag_simplification": 1,
    "iFlag_intersect": 1,
    "iFlag_flowline":1,
    "iFlag_use_mesh_dem":1,
    "iFlag_global": 0,
    "iFlag_multiple_outlet": 0,
    "iFlag_rotation": 0,
    "iFlag_mesh_boundary": 0,
    "iCase_index": 1,
    "iMesh_type": 4,
    "dLongitude_left": -79,
    "dLongitude_right": -74.5,
    "dLatitude_bot": 39.20,
    "dLatitude_top": 42.8,
    "dResolution_degree": 5000,
    "dResolution_meter": 5000,
    "sDate": "20220110",
    "sMesh_type": "mpas",
    "sFilename_spatial_reference": "/full/path/to/pyhexwatershed_icom/data/susquehanna/input/boundary_proj_buff.shp",
    "sFilename_dem": "/full/path/to/pyhexwatershed_icom/data/susquehanna/input/dem_buff_ext.tif",
    "sFilename_mesh_netcdf": "/full/path/to/lnd_cull_mesh.nc",
    "sFilename_mesh_boundary": "/full/path/to/pyflowline/data/susquehanna/input/boundary_wgs.geojson",
    "sFilename_basins": "/full/path/to/pyflowline/examples/susquehanna/pyflowline_susquehanna_basins.json"
}

Parameter

Data type

Usage

Default value

Note

sFilename_model_configuration

string

The filename of the configuration file

None

Automatically generated

sWorkspace_data

string

The workspace for data

None

Unused

sWorkspace_output

string

The output workspace

None

The output folder

sWorkspace_project

string

The project workspace

None

Unused

sWorkspace_bin

string

The workspace for binary executable

None

Reserved for HexWatershed model

sRegion

string

Study region (domain name)

None

None

sModel

string

Model name

pyflowline

None

sJob

string

HPC batch job name

pyflowline

None

iFlag_standalone

int

Flag to run pyflowlone standalone

1

0 when called by hexwatershed

iFlag_mesh_boundary

int

Flag to use mesh boundary file

1

If 0, use dLongitude/Latitude_left/right

iFlag_create_mesh

int

Flag to create mesh

1

None

iFlag_save_mesh

int

Flag to save mesh

1

None

iFlag_simplification

int

Flag to simplification

1

None

iFlag_intersect

int

Flag to intersect

1

None

iFlag_flowline

int

Flag for flowline

1

None

iFlag_use_mesh_dem

int

Flag to use DEM data

0

Not used

iFlag_global

int

Flag to run on global scale

0

None

iFlag_multiple_outlet

int

Flag to run with multi-outlet

0

None

iFlag_rotation

int

Flag for hexagon rotation

0

None

iCase_index

int

Index of case

1

None

iMesh_type

int

Type of mesh

1

None

dLongitude_left

float

Boundary

-180

None

dLongitude_right

float

Boundary

+180

None

dLatitude_bot

float

Boundary

-90

None

dLatitude_top

float

Boundary

+90

None

dResolution_degree

float

Resolution in degree

1

None

dResolution_meter

float

Resolution in meter

5000

None

sDate

string

Date of simulation

None

None

sMesh_type

string

Mesh type

None

None

sFilename_spatial_reference

string

Spatial reference

None

None

sFilename_dem

string

DEM file

None

Reserved for HexWatershed model

sFilename_mesh_netcdf

string

Netcdf mesh file

None

sFilename_mesh_boundary

string

Domain boundary file

None

Required if iFlag_mesh_boundary = 0

sFilename_basins

string

Filename of child JSON file

None

None

An example child JSON file is provided below:

[
{
    "dLatitude_outlet_degree": 39.4620,
    "dLongitude_outlet_degree": -76.0093,
    "dAccumulation_threshold": 100000,
    "dThreshold_small_river": 10000,
    "iFlag_dam": 0,
    "iFlag_debug":1,
    "iFlag_disconnected": 0,
    "lBasinID": 1,
    "sFilename_dam": "/full/path/to/hexwatershed/susquehanna/auxiliary/dams.csv",
    "sFilename_flowline_filter": "/full/path/to/pyflowline/data/susquehanna/input/flowline.geojson",
    "sFilename_flowline_raw": "/full/path/to/hexwatershed/susquehanna/vector/hydrology/allflowline.shp",
    "sFilename_flowline_topo": "/full/path/to/hexwatershed/susquehanna/auxiliary/flowline.csv"
}
]

Parameter

Data type

Usage

Default value

Note

dLatitude_outlet_degree

float

The latitude of outlet

None

dLongitude_outlet_degree

float

The longitude of outlet

dAccumulation_threshold

float

The flow accumulation threshold

dThreshold_small_river

float

The small river threshold

iFlag_dam

int

Flag for dam burning

0

iFlag_debug

int

Flag to turn on debug info

0

iFlag_disconnected

int

Flag for disconnected flowline

0

lBasinID

int

Basin/watershed ID

0

sFilename_dam

string

Filename of dam file

1

Only used for dam burning

sFilename_flowline_filter

string

Filename of original flowline file

GeoJSON format

sFilename_flowline_raw

string

Filename of flowline including dam

Only used for dam burning

sFilename_flowline_topo

string

Filename of dam topology

Only used for dam burning

4.3.2. Inputs

The following recommended workspace structure and example input files are provided to run a PyFlowline simulation. Although the repo includes example configuration files in the examples/ directory, they can be placed wherever the user prefers, as long as the paths within them point to the correct locations for input (and output) data.

data
└── <domain_name>
    ├── input
    │   ├── boundary_wgs.geojson
    │   ├── flowline.geojson
    │   ├── pyflowline_<domain_name>_<meshtype>.json
    │   └── pyflowline_<domain_name>_basins.json
    └── output
        └── ...

4.3.3. Outputs

After running the PyFlowline simulation, the output workspace will be structured as follows:

data
└── <domain_name>
        ├── input
        │   ...
        └── output
            └── <pyflowline_casename>
                ├── 00000001
                │   ├── basin_info.json
                │   ├── confluence_conceptual_info.json
                │   ├── confluence_simplified_info.json
                │   ├── flowline_conceptual.json
                │   ├── flowline_conceptual_info.json
                │   ├── flowline_edge.json
                │   ├── flowline_filter.json
                │   ├── flowline_intersect_mesh.json
                │   ├── flowline_simplified.json
                │   ├── flowline_simplified_info.json
                │   └── vertex_simplified.json
                        ├── 00000002
                │   ├── basin_info.json
                │   ├── confluence_conceptual_info.json
                        │   └── ...
                ├── mpas.json
                ├── mpas_mesh_info.json
                    ├── run_pyflowline.py
                    ├── submit.job
                    ├── stdout.out
                    └── stderr.err

The sub-folders 00000001 et. al, are results for every watershed. Within each watershed sub-folder, there are both json and geojson model output files. The primary (and final) PyFlowline model-generated flowline is flowline_conceptual.json. This file is in the GEOJSON format, and can be viewed directly in QGIS or similar software. Other files that may be of particular interest to users include the model-generated mesh file mpas_mesh_info.json which contains a complete description of the model-generated mesh, and mpas.json which contains the same information in the GEOJSON format, and can be viewed directly in QGIS or similar software. In the <pyflowline_casename> root directory, three HPC-associated files submit.job, stdout.out, stderr.err are generated. The script run_pyflowline.py is the python script that was ran by the HPC job. If you are running on a local machine, you can run this script directly. The table below describes the output files.

Filename

Description

basin_info.json

Basin configuration information output file.

confluence_conceptual_info.json

Complete description of conceptual flowline confluence nodes.

confluence_simplified_info.json

Complete description of simplified flowline confluence nodes.

flowline_conceptual.json

Final modeled flowline in GEOJSON format.

flowline_conceptual_info.json

Final modeled flowline in JSON format.

flowline_edge.json

flowline_filter.json

flowline_intersect_mesh.json

Intermediate modeled flowline in GEOJSON format.

flowline_simplified.json

Intermediate modeled flowline in GEOJSON format.

flowline_simplified_info.json

Intermediate modeled flowline in JSON format.

vertex_simplified.json

Flowline vertex file in GEOJSON format.

mpas.json

Model generated mesh file in GEOJSON format. Contains complete mesh description.

mpas_mesh_info.json

Model generated mesh file in JSON format. Contains complete mesh description.

run_pyflowline.py

Python script that was run by the HPC job (can be run directly on a local machine).

submit.job

HPC associated file

stdout.out

HPC associated file

stderr.err

HPC associated file